高阶段深孔采矿法
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


HIGH LEVEL LONGHOLE MINING METHOD
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    “高阶段深孔采矿法和装备的研究”课题是国家“七五”重大科技攻关项目。本文根据凡口铅锌矿的试验研究情况,详细叙述了高阶段深孔采矿法试验采场的地质条件、采场结构、孔网参数、采场爆破工艺技术的改进,以及所获得的试验结果,指出了该采矿方法的优越性,供类似矿山及同行参考。

    Abstract:

    study on high level longhole mining metod and equipment" was one of the key projects to be tackled in science and technology during China's Seventh Five Year Plan period.Taking Fankou Lead-Zinc Mine for example, the geological conditions, and improvement on stope structure, blasthole patterns and blast technology, in the experiment stope using high level longhole mining method, were introduced in detail, along with the experiment results. The advantages of this mining method were pointed out, which could be useful to similar mines.

    参考文献
    相似文献
    引证文献
引用本文

肖木恩.高阶段深孔采矿法[J].矿业研究与开发,1993,(Z1):

复制
分享
相关视频

文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期:
  • 出版日期:
文章二维码

《矿业研究与开发》严正声明

关闭