Abstract:According to characteristics of some mine such as fractured ore/rock, high in situ stress, and filling underhand stoping drift with high strength concrete, this paper put forward a scheme that level laneway is set in advance in cemented filling body and some reasonable construction and supporting technologies are adopted. The practices prove that the scheme not only can ensure the stability of pre - set laneway and effectively reduce the maintain of laneway, but also is simple in technics, low in cost, high in practicability, short in construction time and so on.